Interim solution

Interim solutions from DENKINGER ensure availability, flexibility and operational reliability - for as long as your new building is under construction.

When time counts, logistics needs space - quickly.

Gaps often occur in the process chain on construction sites and during new construction projects. No space, no capacity – this paralyzes warehousing, production or distribution. Interim solutions bridge this gap: temporary halls, container hubs or modular extensions offer immediately usable space with infrastructure – flexible, ready for use at short notice. For you, this means: no interruptions, no bottlenecks, no loss of time.

Our offer at a glance

Flexible space & operation - ready when you are.

  • Temporary storage and hall space (short and medium term)

  • Mobile office and logistics modules (container solutions, modular buildings)

  • Pre-installed energy & infrastructure: electricity, lighting, charging points

  • Quickly available charging infrastructure for e-vehicles and e-fleets

  • Digital inventory & process control via in-house logistics IT

  • Short-term commissioning – ideal for seasonal peaks, transitional phases or project launches

Typical application scenarios for interim solutions

  • You are expecting new storage or production facilities, but construction is being delayed.

  • Seasonal peaks, short-term order peaks or temporary projects.

  • Bridging the gap between relocation and new building or relocation.

  • Testing new locations, processes or logistics concepts without a long-term commitment.

  • Flexible scaling if capacity is to be increased or reduced in the future.

Create an interim. Secure processes. Keeping an eye on the future.

At DENKINGER, we don’t just start with a free hall. We analyze your needs, identify suitable space – mobile or fixed – and integrate infrastructure, energy and IT so that your operations can start immediately. Our experience in heavy loads, logistics IT and energy integration ensures that your transition phase is not just bridged – but optimally utilized.

Procedure

  1. Clarify requirements (area, duration, processes)

  2. Propose interim solution + conditions

  3. Pre-install infrastructure & energy

  4. Handover & start of operations

  5. Seamless transition to new build or long-term solution

Why Interim with us is more than just transition

  • Quick start: short-term availability of space & infrastructure

  • Cost and planning security: fixed terms, clear conditions

  • Flexibility: modular solutions, scalable according to requirements

  • Integrated energy & IT: charging infrastructure, PV option, logistics IT from a single source

  • Minimize risk: no long-term commitment, manageable CapEx & OpEx

  • Seamless transition: smooth changeover to new build or long-term property

Outline requirements now

Together we will find the right interim solution – energy- and IT-ready, ready for immediate use.

Where to next?

built-to-suit

At DENKINGER, energy becomes a success factor: our AI intelligently controls PV, storage and charging windows, reduces grid charges and stabilizes costs – efficiently, reliably and future-oriented.

BROWNFIELD

We revitalize existing industrial and logistics spaces – thoughtfully planned, sustainably modernized and equipped with energy and IT options. This creates new value on existing land.

energiq

Electricity is the new fuel of logistics. That’s why we plan energy infrastructure in parallel with the property: grid connection capacity, load management, charging points for e-trucks & fleets, PV areas, storage, heating/cooling .

Logistik

Logistics

DENKINGER WINS THE GERMAN LOGISTICS AWARD 2024

Express contact

Contact us

Write to us or give us a call!

Denkinger Internationale Spedition GmbH
Röntgenstraße 6
89584 Ehingen