Ökologiq - three advantages

We prioritize PV and storage intelligently: lower grid consumption, higher degree of self-sufficiency and green charging windows for the fleet - with clear KPIs per month.

1) CO₂ reduction during operation

Our own generation replaces CO₂-intensive grid electricity. The AI prioritizes PV electricity and stores surpluses for peak loads and charging windows. This reduces the Scope 2 footprint – without compromising on availability.

KPIs (examples/placeholders)

  • CO₂ intensity of the supplied kWh: xx g/kWh

  • Avoided emissions p. a.: xx t CO₂

  • Share of green kWh in total consumption: xx %

2) Higher degree of self-sufficiency, less grid consumption

PV + storage increase self-sufficiency – especially when the hall and charging infrastructure need power. This smoothes the load profile, reduces grid consumption and stabilizes the ecological impact over the year.

KPIs (examples/placeholders)

  • Degree of self-sufficiency (month X): xx %

  • PV self-consumption rate: xx %

  • Reduced grid consumption: -xx MWh/year

3) Green charging infrastructure for the fleet

Depot charging is planned with self-generation and storage: Vehicles charge in suitable time windows, PV power has priority, peaks are buffered. This reduces emissions per trip and meets SLAs.

KPIs (examples/placeholders)

  • Charge availability: >99 %

  • Proportion of own electricity for charging: xx %

  • CO₂ per charging process: xx kg (vs. Mains mix yy kg)

Where to next?

Economiq

At DENKINGER, energy becomes a success factor: our AI intelligently controls PV, storage and charging windows, reduces grid charges and stabilizes costs – efficiently, reliably and future-oriented.

brownfield gelände

BROWNFIELD

We revitalize existing industrial and logistics spaces – thoughtfully planned, sustainably modernized and equipped with energy and IT options. This creates new value on existing land.

interimlösung logistik

INTERIM SOLUTIONS

We create space before your new building is completed – with flexible spaces, temporary infrastructure and all the necessary operational services. This keeps your logistics flowing until the new property is ready.

Request a project and check potential

Find out how intelligent energy management combines ecological responsibility and economic benefits.

Logistik

Logistics

Express contact

Contact us

Write to us or give us a call!

DENKINGER GmbH
Röntgenstraße 6
89584 Ehingen