offshore logistics

Your offshore park is ready - but the port has no space for your components?

We create storage capacity in the port hinterland for your offshore components.
Heavy-duty storage areas, pre-assembly zones and space management for wind and grid projects – optimally connected to port, road and rail.

Benefit from our expertise

Request a space & feasibility check

CONTACT

When the port is the bottleneck of the project

  • Components arrive at the terminal faster than they can be loaded.

  • The areas at the port are full, project partners are blocking each other.

  • Components are “somewhere” – without a clear structure, without a clear allocation.

  • Temporary interim storage facilities are borderline in terms of statics and safety.

  • Every shift in the construction plan immediately escalates into a surface drama.

RESULT

  • Unnecessary downtimes

  • High additional costs

  • Increasing project risk

What the space chaos really costs you.

  • Additional demurrage and demurrage charges due to components not provided on time.

  • Additional work and errors in coordination because nobody has a complete overview of areas and stocks.

  • Risk of damage with improvised storage (“Another row of rotor blades at the back, will be fine…”).

  • Political and internal pressure because a logistical bottleneck overturns the overall schedule.


In short: If the port areas tip, the project will collapse.

Solution 1:

Heavy-duty storage areas as a buffer between the plant and the port.

  • Heavy-duty exterior surfaces with high floor load-bearing capacity.

  • Storage of large components in defined clusters (by project/lot/construction phase).

  • Connection to road and partly rail – for your existing transport partners (important because you do not provide XXL transports yourself).

  • Optional hall areas for more sensitive components.

Solution 2:

Planned pre-assembly zones instead of temporary unloading corners.

Reserved zones for:

  • Pre-assembly / pre-assembly steps

  • Picking by shipload / construction stage

  • Staging for “next ship / next phase”

  • Crane and handling technology on our premises (where available).

  • Joint planning with your EPC / terminal so that it is clear: What is located where, for which slot?

Solution 3:

Transparent space and inventory planning instead of space tetris.

  • Joint space planning based on your project phases and volumes.

  • Digital allocation of areas and slots to specific parts / lots.

  • Inventory overview: What is already at the hinterland hub, what is en route, what is intended for which port/ship slot?

  • Interfaces to your systems possible (Excel → to TMS/Project Tools).

Solution 4:

A fixed logistics partner for your area theme.

    • Project team at DENKINGER as the central contact for hinterland storage.

    • Regular coordination with:

      • Your project managers

      • Transportation service providers

      • Port / Terminal

    • Clear reports on area occupancy, turnover and pending movements.

Why your components are in good hands with us.

A fixed logistics partner for your area theme.

istockphoto-1457570133-1024x1024
  • Several logistics locations in Germany, including in Bremerhaven directly at the port

  • Heavy-duty equipment: reach stackers, large forklifts, cranes

  • Rail sidings at selected locations – ideal if your components come/go by rail.

  • Experience in steel, mechanical engineering and large component logistics.

  • Own energy management (PV, storage, e-truck) → sustainable project design.

Start area check now